Window, Door and Siding Permits
A retaining wall permit is required when elevation change is greater than 2 feet.
Project Details
Please note that the required project details will vary based on each project's unique characteristics.
- Window Replacements (number of individual windows)
- Door Replacements (number of individual doors)
- Exterior Veneer or Soffit valuation (not including window/door value)
- Windows Mulled together (Yes/No)
- Mullion FL Product Approval Number
- Window/Door FL Product Approval Number
- Window/Door Manufacturer
- Ext. Veneer/Soffit FL Product Approval Number
- Ext. Veneer/Soffit Manufacturer
- Ext. Veneer/Soffit Material and Applied Over
Project Checklist, Affidavits and Information Sheets
- Affidavits
- Information Sheets
Review Time Frame
The review time frame for a window/door/siding permit is 5 work days.